
Logan Airport Terminal C | Rizvi
12-06-2014:MODERNi: The checkpoint consolidation project at Logan Airport Terminal C designed by Rizvi Architects was completed in 2012. The new checkpoint space addition is 40,000 s.f. and the project includes a new addition/renovation of approximately 72,000 square feet including new checkpoint space from the JetBlue ticket counters to the east end of the existing TSA bag screening building for the new security checkpoint, post security connection, and future retail space…Read More!
Tags
[srp post_limit=”5″ widget_title=” ” thumbnail_height=”130″ thumbnail_width=”130″ post_content_length_mode=”words” post_title_length_mode=”words” post_random=”yes” post_author_url=”no” post_category_link=”no” post_date=”no” layout_mode=”multi_column” layout_num_cols=”5″ post_content_mode=”thumbonly”]
Sorry, the comment form is closed at this time.